Review Type | Outcome | Est. Review Start Date | Completed |
---|---|---|---|
Environmental Health Review | Approved | 06/20/2023 | 06/14/2023 |
Mary VonEschen
Send Email
|
|||
Miscellaneous
Resolved
06/14/2023
Send applicant signed septic system self-disclosure form. Applicant will need to apply for a septic permit and have that approved before we can sign off on this permit.
|
|||
Environmental Health Review | Failed | 06/05/2023 | 06/05/2023 |
Dave Guenther
Send Email
|
|||
Miscellaneous
Resolved
06/05/2023
This building permit would require a compliance inspection to be done on the septic system.
|
|||
Miscellaneous
Carry Forward
06/14/2023
Send applicant signed septic system self-disclosure form. Applicant will need to apply for a septic permit and have that approved before we can sign off on this permit.
|
|||
Building Review | Approved | 06/05/2023 | 06/02/2023 |
Daniel Bisek
Send Email
|
|||
Miscellaneous
Resolved
06/02/2023
Submit a new fully completed energy code compliance certificate. The form that was received with the first submittal is not complete as the entire form must be filled out.
(property address, contractor information, insulation type and locations, radon info)
|
|||
Miscellaneous
Resolved
06/02/2023
Submit ICF manufactures instructions.
|
|||
Miscellaneous
Resolved
06/02/2023
Submit truss specifications and layout.
|
|||
Building Review | Failed | 05/12/2023 | 05/15/2023 |
Daniel Bisek
Send Email
|
|||
Miscellaneous
Carry Forward
05/30/2023
Submit a new fully completed energy code compliance certificate. The form that was received with the first submittal is not complete as the entire form must be filled out.
(property address, contractor information, insulation type and locations, radon info)
|
|||
Miscellaneous
Carry Forward
05/30/2023
Submit ICF manufactures instructions.
|
|||
Miscellaneous
Carry Forward
05/30/2023
Submit truss specifications and layout.
|
|||
Environmental Health Review | Failed | 05/12/2023 | 05/15/2023 |
Dave Guenther
Send Email
|
|||
Miscellaneous
Carry Forward
05/30/2023
This building permit would require a compliance inspection to be done on the septic system.
|
|||
Planning Department Review | Approved | 05/12/2023 | 05/12/2023 |
Nathan Hall
Send Email
|
|||
Erosion Control Plan Review | Not Required | 05/12/2023 | 05/11/2023 |
Collin Schoenecker
Send Email
|
|||
Erosion Control Field Review | Not Required | 05/12/2023 | 05/11/2023 |
Collin Schoenecker
Send Email
|
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $3,248.17 | $3,248.17 | Paid | 06/14/2023 |
Building Permit State Surcharge | $175.00 | $175.00 | Paid | 06/14/2023 |
Plan Check Fee (Building) | $2,111.31 | $2,111.31 | Paid | 06/14/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $5,534.48 | $5,534.48 | $0.00 |
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion Control Final | Not Required | 05/11/2023 | ||
Radon Above Grade Rough In | Not Required | 06/02/2023 | ||
Radon/Vapor Barrier Under Slab | Not Required | 06/02/2023 | ||
Radon Final | Not Required | 06/02/2023 | ||
Footing | Partial Pass | 6/16/2023 (10:30 to 11:00) | 6/16/2023 (AM) | 06/16/2023 |
Miscellaneous
Carry Forward
06/16/2023
The footings and pads on the south side of the house are good. - Partial pass
|
||||
Poured Wall Forms | Passed | 6/21/2023 (9:00 to 9:30) | 6/21/2023 (AM) | 06/21/2023 |
Footing | Passed | 7/12/2023 (9:00 to 9:30) | 7/12/2023 (AM) | 07/12/2023 |
Miscellaneous
Resolved
07/12/2023
The footings and pads on the south side of the house are good. - Partial pass
|
||||
Poured Wall Forms | Passed | 7/13/2023 (3:30 to 4:00) | 7/13/2023 (PM) | 07/13/2023 |
Footing | Passed | 9/12/2023 (2:00 to 2:30) | 9/12/2023 (PM) | 09/12/2023 |
Miscellaneous
Inspector Comment
09/12/2023
Grill deck footings appear OK
|
||||
Foundation | Passed | 9/28/2023 (11:30 to 12:00) | 9/28/2023 (AM) | 09/28/2023 |
Framing | Not Required | 9/28/2023 (11:30 to 12:00) | 9/28/2023 (AM) | 09/28/2023 |
Framing/Weather Barrier/Roof | Partial Pass | 9/28/2023 (11:30 to 12:00) | 9/28/2023 (AM) | 09/28/2023 |
Miscellaneous
Carry Forward
09/28/2023
Missing tension straps at garage doors per braced wall plan. Ok with garage door bucks with nailing at 3” o.c.
Ok to insulate
|
||||
Framing/Weather Barrier/Roof | Partial Pass | 10/10/2023 (3:00 to 3:30) | 10/10/2023 (PM) | 10/10/2023 |
Miscellaneous
Resolved
10/10/2023
Missing tension straps at garage doors per braced wall plan. Ok with garage door bucks with nailing at 3” o.c.
Ok to insulate
|
||||
Attic access opening
Carry Forward
10/10/2023
Attic access opening must be provided not less than 22”x30” with a minimum clear height of not less than 30”. MRC R807.1 Partial pass
|
||||
Insulation | Partial Pass | 10/10/2023 (3:00 to 3:30) | 10/10/2023 (PM) | 10/10/2023 |
Miscellaneous
Carry Forward
10/10/2023
Provide insulation certificate for the attic, walls and garage ceiling blown-in insulation at the final inspection.
|
||||
Miscellaneous
Carry Forward
10/10/2023
OK to hang gypsum.
|
||||
Lath | Passed w/ Conditions | 12/6/2023 (10:00 to 10:30) | 12/6/2023 (AM) | 12/06/2023 |
Miscellaneous
Inspector Comment
12/06/2023
The lath was covered before inspection.
|
||||
Framing/Weather Barrier/Roof | Passed | 1/17/2024 (10:00 to 10:30) | 1/17/2024 (AM) | 01/17/2024 |
Attic access opening
Resolved
01/17/2024
Attic access opening must be provided not less than 22”x30” with a minimum clear height of not less than 30”. MRC R807.1 Partial pass
|
||||
Insulation | Passed | 1/17/2024 (10:00 to 10:30) | 1/17/2024 (AM) | 01/17/2024 |
Miscellaneous
Resolved
01/17/2024
Provide insulation certificate for the attic, walls and garage ceiling blown-in insulation at the final inspection.
|
||||
Miscellaneous
Inspector Comment
10/10/2023
OK to hang gypsum.
|
||||
Final | Failed | 1/17/2024 (10:00 to 10:30) | 1/17/2024 (AM) | 01/17/2024 |
Smoke detectors installed
Carry Forward
01/17/2024
Smoke detector required inside each sleeping room, outside in the vicinity of the sleeping rooms, and on each floor level MRC R314
|
||||
Final | Passed | 3/5/2024 (11:30 to 12:00) | 3/5/2024 (AM) | 03/05/2024 |
Smoke detectors installed
Resolved
03/05/2024
Smoke detector required inside each sleeping room, outside in the vicinity of the sleeping rooms, and on each floor level MRC R314
|